Changes at Nearly 100 Year Old High School Create a 21st Century Education Environment

Additions and Remodeling at West Chicago Community High School

The high school was at maximum capacity and in need of more and more flexible space. Built in 1926 with additions constructed in 1955, 1964, 1977, and 1997, the existing building was complicated. In a Long Range Plan the District and Architect developed in 1996, the eventual expansion was predicted. Knowing the site was landlocked, the one-story 1997 addition was designed in anticipation of a 2nd floor addition. Today, decades of careful planning resulted in a facility that not only meets space needs but is transformed to better align with current and future curricula. The project increased the school’s ability to leverage problem-based learning, integrated curriculum, the integration of technology and curriculum as well as addressing learning styles and multiple intelligences of students.

While the nature of learning and working is changing under our very feet the newly designed spaces at the High School have provided the flexibility and possibility to create workspace for any number of situations. The open spaces and flexible furniture allow students and staff to observe, study and communicate independently or collaboratively. The new library is also conducive to large (socially distanced) staff meetings that allow for adult learning and collaborating while simultaneously housing staff members in safe individual spaces to work independently to design and deliver remote learning. The ease in which all the newly renovated space at the High School can be used has been a huge asset for the staff who are working from school while students learn remotely. Additionally, a return to in-person instruction is planned and the malleability of the spaces will allow the school to create several options to address all contingencies.

Before After
The open spaces and flexible furniture allow students and staff to observe, study and communicate independently or collaboratively. The new library is also conducive to large (socially distanced) staff meetings that allow for adult learning and collaborating while simultaneously housing staff members in safe individual spaces to work independently to design and deliver remote learning.
By placing breakout spaces with large whiteboards in all academic content areas teachers are able to sub-divide their classes during a given period or collaborate with students from other disciplines and classes easily and fluidly.

The flexible open spaces created by this project created classrooms and community spaces where students and staff can gather to share ideas, break out into smaller groups, and reconvene to share approaches, questions, and thoughts.  The creation of “breakout” rooms and spaces in all areas of the building has already proven fruitful despite students learning from home. Staff and faculty have already utilized these large areas to work collaboratively in person while remaining socially distant.  Staff have used the breakout spaces to redesign curriculum for remote delivery, share ideas on new instructional design and develop logistical strategies for bringing students back to campus.  The abundance and proximity of these spaces to classrooms will allow staff to continue to incorporate PBL into their pedagogy.

To better align with regional sustainable economic development goals, vocational education was rejuvenated. The project created a new Manufacturing Lab outfitted with 3D printers, lathes, milling machines, drill press, and other modern industrial equipment.

By placing breakout spaces with large whiteboards in all academic content areas teachers are able to sub-divide their classes during a given period or collaborate with students from other disciplines and classes easily and fluidly.
More and more research and best practices into curricular approaches across all content areas rely upon collaboration, communication, and critical thinking. These learning hub spaces and the accompanying audio/visual integration facilitate this. The distinctiveness of each content area is accented by a unique color scheme that delineates the spaces while following a similar palette that connects the entire school.
Knowing the site was landlocked, the one-story 1997 addition was designed in anticipation of a 2nd floor addition. Today, decades of careful planning resulted in a facility that not only meets space needs but blends a new aesthetic into an existing building context, both inside and out.
The school highly valued history and heritage. In the renovation of 1926 portions of the building, care was taken to preserve notable details. The interior design surrounding these pieces is consistent with the rest of the building, but sensitive to these traditional elements.

Related Works

Other stunning projects for our amazing clients

A Modern and Open Office Design
A Content Production Facility Design Enhances Technical and Support Spaces
TV and Radio Broadcast Studio Gets a State-of-the-Art Renovation
A Public Space Offers Privacy and Flexibility
A Tasty New Look
Taking it to the MAX
Just the Right Chemistry
An Industrial Revolution
Rising to New Heights
An Historic Renovation from the Inside Out
BEComing a Green Office
Aligning Design with Values
Enhancing the Mission
Money Isn’t the Only Thing Green in Banking
Connecting with the Community
Share Our Work