Transforming an Existing High School for Today's Learners

Kankakee High School Renovation Phase 1

The renovations at Kankakee High School were not entered lightly. DLA started with a facility assessment to understand the existing conditions. While this was happening, the project team and district administrators investigated successful school communities around the globe and discussed how the facilities played a role in their programs. They also began gathering input from administrators, teachers, students, and community members to understand how the facility was being used and how that will be different in the future. After more than a year of planning and exploration, the program and design took shape.

Phase 1 kicked-off dramatic improvements that will result in a “virtually new” building tailored to match the instruction at Kankakee High School. From the street, the new entrance and parking draw the eye. The added vestibule helps to make it more secure and noticeable.

Before After

Band and Orchestra students no longer commute to a remote location for instruction or practice. Remodeled spaces created a new band room, and the choir room was updated. The auditorium has a reshaped stage, plus ancillary spaces like a prop workshop.

Before After KANKAKEE High School Auditorium
4 new serving stations off a main circulation route eliminate previous queuing headaches.

The cafeteria was transformed into a commons area and is now also the school’s main corridor. To accommodate an expanded culinary arts program, the commercial kitchen functions as a lab to educate students how to cook in the restaurant industry.

To better align with the newly adopted Reggio-inspired approach to teaching and learning, the traditional classrooms are reimagined. The resulting design creates an array of common learning spaces that radiate from Learning Hubs. Educators are provided the flexibility to be responsive to the needs and interests of the students and community. The educators can create experiences that allow learning to happen on a deeper level. The new clusters of large and small meeting spaces, teacher meeting spaces, and labs encourage collaboration and embrace technology.

The cafeteria is student focused, with zoned areas for introspective work, one-on-one collaboration, and small group collaboration.
Typical classrooms are now flexible and can be adapted to specialty programs, such as nursing or robotics.
The labs were designed for flexibility. “Activators” are not locked into a subject and can respond to the needs and interests of the students.

Before After KANKAKEE High School Flexible Classroom
The new clusters of large and small meeting spaces, teacher meeting spaces, and labs encourage collaboration and embrace technology.

Related Works

Other stunning projects for our amazing clients

Master Facilities Plan serves as a guide for assessing the need for facility improvements and capital investments to implement them
Community-Centric School Renovations & Addition
Educating the Future Manufacturing and Technology Workforce
Inclusive Adaptive Reuse
A Hub for Learning and Community
Future-Ready and Net Zero STEM Spaces
Revitalizing Creativity: Culinary and Fashion Interior Renovations to Empower Next-Gen Innovators
Developing Career Skills in a Future-Ready Learning Environment
Ignite Creativity with a Student-Centric Approach to Design Thinking
New Elementary School Designed for Anywhere, Anytime Learning
New Elementary School designed to make learning more flexible
New Early Learning Center is Child-Centered, Nature-Inspired, and Energy Efficient
Changes at Nearly 100 Year Old High School Create a 21st Century Education Environment
New Nature-Inspired Playground
Addition provides much needed space for vibrant Fine Arts programs
Making a Middle School
Reimagined Learning Spaces
Putting the Cool in Culinary Arts
Fieldhouse Rises from the Rubble
Transforming an Existing High School for Today’s Learners
Share Our Work