Central Campus: Industrial Technology Addition and Renovations
Client:
Minooka Community High School District 111
Minooka Community High School District 111, in partnership with DLA Architects, reshaped Career and Technical Education (CTE) with a facility designed to give students direct access to the skills, tools, and environments that today’s skilled trades and technical careers demand. This project addressed long-standing infrastructure gaps while creating a forward-looking learning environment built to serve a growing student population for decades to come.




Key Features and Facilities
Spanning 32,100 square feet of new construction and 24,100 square feet of remodeled space, the Industrial Technology Addition consolidated and elevated the district’s CTE programming under one cohesive, purpose-built facility. Each lab was designed to mirror the professional environments students will encounter after graduation.
- High-Tech Auto Shop: A professional-grade automotive workspace that gives students hands-on experience with the tools, equipment, and workflows found in real-world service centers.
- Advanced Welding Workshop: A dedicated space for skill development in one of the most in-demand trades, built to accommodate hands-on instruction at every level.
- Robotics and Electricity Lab: A specialized environment for students exploring emerging technologies, automation, and the foundational principles of electrical systems.
- Construction Lab: Designed to support building trades training, this space provides students with practical exposure to construction methods and materials.
- Woodworking Lab: A focused space for craftsmanship instruction, equipping students with skills in precision, tool use, and design.
- Metal Fabrication Lab: An industrial-grade facility supporting skills in fabrication, machining, and manufacturing processes.
- Professional-Grade Commercial Kitchen: Built for culinary and hospitality training, this kitchen gives students the same tools and workflows they will encounter in food service and hospitality careers.
- Residential Culinary Room: A remodeled residential culinary lab focuses on home economics, everyday cooking, and nutrition, expanding access to culinary education for a wider range of students.
- Fine Arts Renovations: Two fully remodeled art rooms replace outdated spaces with purpose-designed studio environments, featuring improved lighting, functional layouts, and updated materials storage to better support creative instruction.
- PE and Team Locker Room Renovations: Men’s and women’s PE and team locker rooms were fully renovated to provide modern, welcoming spaces that support student athletes and PE participants alike, reflecting the district’s commitment to student wellness.
Design and Innovation
The facility was built around a core principle: learning environments should be as responsive as the fields they serve. Key design priorities included:
- Flexible, modern layouts that can adapt as technology, curriculum, and industry standards evolve over time
- Energy-efficient systems that support long-term operational cost management
- Scalable infrastructure designed to accommodate growing enrollment without compromising program quality
- Inspiring aesthetics that signal to students the value placed on their education and future, creating spaces that motivate engagement from the moment they walk in
This approach reflects a broader commitment to designing spaces that meet not just today’s needs, but the ones that have not yet emerged. Across every space — from the welding workshop to the renovated art rooms to the updated locker rooms — the design team worked to ensure that every student, regardless of their academic or athletic path, experiences a campus that is invested in them.
Learning Outcomes
The Industrial Technology Addition moved CTE education out of dated classrooms and into environments that function like real workplaces. Students gained:
- Immersive, hands-on experience across trades and technical disciplines, reinforcing skills through practice rather than passive instruction
- Direct alignment with industry career pathways, ensuring that time spent in each lab translates to relevant, marketable competencies
- Preparation for high-demand professions in manufacturing, construction, culinary arts, robotics, and skilled trades, fields that continue to face significant workforce shortages
- Access to updated creative and wellness spaces that support the full breadth of student life, from studio art to physical education
When students can see and touch and build the work in front of them, the path from classroom to career becomes far more concrete.
A Lasting Investment in Students and Community
For years, Minooka Community High School District 111 faced the real constraints of outdated facilities and limited capacity. This project resolved those challenges directly. By replacing aging infrastructure across CTE, fine arts, culinary education, and athletics with modern, purpose-built environments, the district made a clear statement: every dimension of a student’s education deserves the same level of investment.
The result is a facility that positions every student, regardless of their intended path after graduation, with the practical knowledge, creative foundation, and professional-grade experience to pursue it with confidence.
Related Works
Other stunning projects for our amazing clients












